Out-of-Straightness Analysis - December 2001
GeoLine has been awarded a contract by Mærsk Oil and Gas AS to provide online out-of-straightness (OOS) analysis during trenching and survey operations.
The work covers OOS-analysis for 7 pipelines from 6" to 16" as follows:
- 16" Tyra SE - Tyra EB gas pipeline (10.3km)
- 8"/3.5" Tyra SE - Tyra EB piggyback pipeline (10.3km)
- 10" Kraka - Dan DA multiphase pipeline (8.9km)
- 16" Dan FF - Halfdan FA water injection pipeline (9.1km)
- 14" Halfdan BA - Halfdan A multiphase pipeline (1.7km)
- 12" Halfdan A - Halfdan BA water injection pipeline (1.7km)
- 6" Halfdan A - Halfdan BA gas lift pipeline (1.7km)
Out-of-Straightness Analysis - January 2002
GeoLine has been awarded a contract by Mærsk Oil and Gas AS to provide online out-of-straightness (OOS) analysis during trenching and survey operations.
The work covers OOS-analysis for 7 pipelines from 6" to 16" as follows:
- 16" Tyra SE - Tyra EB gas pipeline (10.3km)
- 8"/3.5" Tyra SE - Tyra EB piggyback pipeline (10.3km)
- 10" Kraka - Dan DA multiphase pipeline (8.9km)
- 16" Dan FF - Halfdan FA water injection pipeline (9.1km)
- 14" Halfdan BA - Halfdan A multiphase pipeline (1.7km)
- 12" Halfdan A - Halfdan BA water injection pipeline (1.7km)
- 6" Halfdan A - Halfdan BA gas lift pipeline (1.7km)
Out-of-Straightness Analysis - December 2001
GeoLine has been awarded a contract by Mærsk Oil and Gas AS to provide online out-of-straightness (OOS) analysis during trenching and survey operations.
The work covers OOS-analysis for 7 pipelines from 6" to 16" as follows:
- 16" Tyra SE - Tyra EB gas pipeline (10.3km)
- 8"/3.5" Tyra SE - Tyra EB piggyback pipeline (10.3km)
- 10" Kraka - Dan DA multiphase pipeline (8.9km)
- 16" Dan FF - Halfdan FA water injection pipeline (9.1km)
- 14" Halfdan BA - Halfdan A multiphase pipeline (1.7km)
- 12" Halfdan A - Halfdan BA water injection pipeline (1.7km)
- 6" Halfdan A - Halfdan BA gas lift pipeline (1.7km)
Pile Driveability Assessment of Monopiles for North Hoyle Windfarm and Frederikshavn Wind Turbines - March 2002
GeoLine has been awarded a contract by Hydro Soil Services NV to carry out pile driveability assessment for the North Hoyle windfarm located offshore North Wales in Liverpool Bay Irish Sea. The contact furthermore included pile driveability assessment for Frederikshavn wind turbines.
The work includes review of geotechnical data (borehole logs, CPT profiles and laboratory soil tests) for the driveability design soil profile, soil resistance during driving (SRD) analyses and wave equation analyses.
GeoLine and CRISP Consortium sign co-operation agreement - January 2002
GeoLine and CRISP Consortium (CRISP Consortium) have recently signed a co-operation agreement covering pipeline and geotechnical services. CRISP Consortium is the developer of SAGE CRISP, a geotechnical finite element modeling software with 2D and 3D capabilities.
Upheaval Buckling Calculations - June 2001
GeoLine has been awarded a contract by Mærsk Oil and Gas AS to carry out upheaval buckling calculations assuming natural half imperfection wavelengths and imperfection heights from 0.1m to 0.4m in steps of 0.1m.
The work covers analyses for 7 pipelines from 6" to 16" as follows:
- 16" Tyra SE - Tyra EB gas pipeline (10.3km)
- 8"/3.5" Tyra SE - Tyra EB piggyback pipeline (10.3km)
- 10" Kraka - Dan DA multiphase pipeline (8.9km)
- 16" Dan FF - Halfdan FA water injection pipeline (9.1km)
- 14" Halfdan BA - Halfdan A multiphase pipeline (1.7km)
- 12" Halfdan A - Halfdan BA water injection pipeline (1.7km)
- 6" Halfdan A - Halfdan BA gas lift pipeline (1.7km)
Pile Driveability Assessment of Large Monopiles for Rødsand and Samsø Offshore Windfarm - January 2002
GeoLine has been awarded a contract by Hydro Soil Services SA/NV to carry out pile driveability assessment for the Rødsand and Samsø windfarm located offshore Denmark.
The work included further review of geotechnical data (boreholes, CPT profiles and laboratory soil tests) for the design driveability soil profile, soil resistance during driving (SRD) analysis and wave equation analysis.
COWI A/S and GeoLine sign co-operation agreement - July 2002
GeoLine and COWI A/S (COWI) have recently signed a co-operation agreement, where GeoLine is to support COWI in the fields of offshore pipeline and geotechnical engineering services.
COWI is one of the largest engineering consultancy companies in Denmark.
SAGE Profile Software Development and Support - Januar 2002
GeoLine has been awarded a contract by Thales GeoSolutions (formerly know as SAGE Engineering) SA/NV to provide SAGE Profile technical support and software planning, design and development.
Pipeline Crossing Analysis - 22 January 2002
As part of the work awarded by Mærsk Oil and Gas AS, GeoLine has carried pipeline crossing analysis for the Halfdan 16" pipeline.
SAGE Profile training for John Brown Hydrocarbons Ltd - February 2002
GeoLine has been awarded a contract by Thales GeoSolutions SA/NV to carry out a joint SAGE Profile training program for John Brown Hydrocarbons Ltd (formerly Kvaerner) in London.
Client Representative During Trenching and Survey Operations - December 2001
GeoLine has been awarded a contract by Mærsk Oil and Gas AS to provide a client representative during trenching and survey operations carried out by DSND Norway.
In total 7 pipelines were trenched and buried successfully using the Capjet 650. The pipelines were surveyed using the TSS-340 pipe tracker.
Pile Driveability Assessment Check - June 2002
GeoLine has been awarded a contract by Mærsk Oil Qatar AS to carry out pile driveability assessment check for 8 jacket platforms located in the MOQ
Al-Shaheen field offshore Qatar. The Jackets are installed by HHI in South
Korea.
The work includes review of the geotechnical data (borehole logs, CPT profiles and laboratory soil test data) for the driveability design soil profile, soil resistance during driving (SRD) analyses and wave equation analyses.